Infrastructure (ProjectWatch)
Completed
Sagip Saka Supply & Delivery of Rice Maslog, Eastern Samar
GEF-26-08-26-14-000-5A
• Eastern Samar, Maslog
Physical Status:
0.0%
Target Completion: Dec 31, 2026
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
PROJECT NANAY: Nutrition And Nurturing All Years of Motherhood "Alagang Nanay, Nutrisyong Sapat, Malusog na Sanggol."
GEF-25-08-26-01-000-1B
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Nov 30, 2027
Cost / Allocation
₱2.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Establishment of the Municipal NutriBun Production Kitchen
GEF-25-08-26-01-000-1A
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Jan 27, 2027
Cost / Allocation
₱750,000.00
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
SUPPLY AND DELIVERY OF MULTI-VITAMINS
GEF-25-08-26-21-000-1B
• Eastern Samar, San Policarpo
Physical Status:
0.0%
Target Completion: Dec 2, 2026
Cost / Allocation
₱372,000.00
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
SUPPLY AND DELIVERY OF ITEMS FOR NUTRITION PROGRAM
GEF-25-08-26-21-000-1A
• Eastern Samar, San Policarpo
Physical Status:
0.0%
Target Completion: Dec 2, 2026
Cost / Allocation
₱2.41M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Solar Electrification of Brgy. Hall, Brgy. Tanauan, San Policarpo, Eastern Samar
GEF-26-08-26-21-000-1B
• Eastern Samar, San Policarpo
Physical Status:
0.0%
Target Completion: Oct 30, 2026
Cost / Allocation
₱890,745.70
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
New Road Construction within the Brgy. Tanauan, San Policarpo, Eastern Samar
GEF-26-08-26-21-000-1A
• Eastern Samar, San Policarpo
Physical Status:
0.0%
Target Completion: Oct 21, 2026
Cost / Allocation
₱3.01M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Supply and Delivery of Premium Rice
GEF-26-08-26-21-000-2B
• Eastern Samar, San Policarpo
Physical Status:
0.0%
Target Completion: Sep 1, 2026
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Installation of Solar Streetlights, Municipal Wide, San Policarpo, Eastern Samar
GEF-26-08-26-21-000-2A
• Eastern Samar, San Policarpo
Physical Status:
0.0%
Target Completion: Dec 31, 2026
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
PROCUREMENT OF RICE FOR THE DISTRIBUTION PROJECT, ASSISTANCE INDIGENT INDIVIDUALS OR FAMILIES IN ARTECHE, EASTERN SAMAR, UNDER THE LOCAL GOVERNMENT SUPPORT FUND-GROWTH EQUITY FUND (LGSF-GEF) FISCAL YEAR (FY) 2026 GENERAL APPROPRIATIONS ACT (GAA) OR REPUBLIC ACT NO. 12314
GEF-26-08-26-01-000-6A
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Sep 6, 2026
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Provision of Renewable Energy-Based Electrification at Barangays Buenavista, Carapdapan, Garden, Central, Rawis and Balud
GEF-26-08-26-01-000-6B
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Mar 23, 2027
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Provision of Renewable Energy-Based Electrification at Barangay Macarthur
GEF-26-08-26-01-000-3B
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Dec 3, 2026
Cost / Allocation
₱2.10M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Improvement and Concreting of Barangay Road at Brgy. Macarthur
GEF-26-08-26-01-000-3A
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Nov 30, 2026
Cost / Allocation
₱1.80M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Provision of Renewable Energy-Based Electrification at Barangay Tawagan
GEF-26-08-26-01-000-4B
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Dec 3, 2026
Cost / Allocation
₱2.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
IMPROVEMENT AND CONCRETING OF BARANGAY ROAD AT BARANGAY TAWAGAN
GEF-26-08-26-01-000-4A
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Nov 30, 2026
Cost / Allocation
₱1.40M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Provision of Renewable Energy-Based Electrification at Barangay Casidman
GEF-26-08-26-01-000-2B
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Dec 3, 2026
Cost / Allocation
₱1.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Improvement and Concreting of Barangay Road at Barangay Casidman
GEF-26-08-26-01-000-2A
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Dec 31, 2026
Cost / Allocation
₱2.40M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Improvement and Concreting of Barangay Road at Barangay Tibalawon
GEF-26-08-26-01-000-5
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Dec 31, 2026
Cost / Allocation
₱3.90M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
OPENING WITH CONCRETING OF LOCAL ROAD AT BARANGAY CAGSALAY
GEF-26-08-26-01-000-1
• Eastern Samar, Arteche
Physical Status:
0.0%
Target Completion: Dec 31, 2026
Cost / Allocation
₱3.90M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
ROAD IMPROVEMENT ALONG MASLOG-CAN-AVID PROVINCIAL ROAD, MASLOG, EASTERN SAMAR
GEF-2026--6
• Eastern Samar, Maslog
Physical Status:
0.0%
Target Completion: Jan 16, 2027
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
TUNGA FOOD SECURITY AND CONSTRUCTION OF SOLAR LIGHTS
GEF-26-08-37-50-000-1
• Leyte, Tunga
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
TUNGA MUNICIPAL NUTRITION ENHANCEMENT PROGRAM
GEF-2026--5
• Leyte, Tunga
Physical Status:
0.0%
Target Completion: Jun 30, 2026
Cost / Allocation
₱3.21M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CLIMATE-SMART EVACUATION CENTER IN BRGY. CONSUEGRA, LEYTE, LEYTE
SAFPB-25-08-37-29-000-1
• Leyte, Leyte
Physical Status:
0.0%
Target Completion: Dec 31, 2026
Cost / Allocation
₱25.93M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
INSTALLATION OF SOLAR-POWERED STREETLIGHTS IN THE 26 BARANGAYS OF THE MUNICIPALITY OF JULITA, LEYTE
GEF-26-08-37-25-000-1B
• Leyte, Julita
Physical Status:
0.0%
Target Completion: Jun 30, 2026
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
REHABILITATION OF LOCAL ROAD IN BARANGAY GUINCIAMAN, SAN MIGUEL, LEYTE
FALGU-26-08-37-43-000-2
• Leyte, San Miguel
Physical Status:
0.0%
Target Completion: Nov 30, 2026
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF LOCAL ACCESS ROAD TO TUNOG BEACH AND GUINDUYANAN COVE
GEF-2026--4
• Eastern Samar, Hernani
Physical Status:
0.0%
Target Completion: Apr 24, 2027
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONCRETING FARM TO MARKET ROAD
GEF-2026--3
• Leyte, Mayorga
Physical Status:
0.0%
Target Completion: Mar 10, 2026
Cost / Allocation
₱30.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
OTHER ICTS AND INFRA DEVELOPMENT: SAMAR INTEGRATED INFORMATION AND COMMAND SYSTEM (SIICS) CLUSTER 1: FOUNDATIONAL SYSTEMS, SAMAR
FALGU-2026--9
• Samar, Catbalogan
Physical Status:
0.0%
Target Completion: Dec 30, 2026
Cost / Allocation
₱59.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF A LACTATION STATION
GEF-25-08-48-01-000-1A
• Northern Samar, Regional Scope
Physical Status:
0.0%
Cost / Allocation
₱780,000.00
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
PROCUREMENT OF RICE UNDER FY 2026 LGSF-GEF
GEF-26-08-48-01-000-1B
• Northern Samar, Allen
Physical Status:
0.0%
Cost / Allocation
₱3.80M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
PROCUREMENT OF RICE UNDER FY 2026 LGSF-GEF
GEF-26-08-48-01-000-1A
• Northern Samar, Allen
Physical Status:
0.0%
Cost / Allocation
₱1.20M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF TWO-STOREY SCHOOL BUILDING
GEF-26-08-48-01-000-1C
• Northern Samar, Allen
Physical Status:
0.0%
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF FARM-TO-MARKET ROAD IN BARANGAY SAN ISIDRO, BARUGO
FALGU-2026--8
• Leyte, Barugo
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF FARM TO MARKET ROAD IN BRGY. MASLOG (SITIO NGENGUE NATIONAL HIGHWAY TO SITIO KALASAG), LAWAAN, EASTERN SAMAR
GEF-26-08-26-12-000-1B
• Eastern Samar, Lawaan
Physical Status:
0.0%
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
NEW CONSTRUCTION OF FARM-TO-MARKET ROAD
GEF-26-08-26-07-000-4
• Eastern Samar, General MacArthur
Physical Status:
0.0%
Cost / Allocation
₱3.90M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
NEW CONSTRUCTION OF FARM-TO-MARKET ROAD AT BRGY QUEZON
GEF-26-08-26-07-000-3
• Eastern Samar, General MacArthur
Physical Status:
0.0%
Cost / Allocation
₱3.90M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
NEW CONSTRUCTION OF FARM-TO-MARKET ROAD AT BRGY MAGSAYSAY
GEF-26-08-26-07-000-2
• Eastern Samar, General MacArthur
Physical Status:
0.0%
Cost / Allocation
₱3.90M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
OPENING WITH CONCRETING OF FARM-TO-MARKET ROAD AT BRGY LIMBUJAN
GEF-26-08-26-07-000-1
• Eastern Samar, General MacArthur
Physical Status:
0.0%
Cost / Allocation
₱3.90M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
STRENGTHENING NUTRITION IN THE FIRST 1000 DAYS FOR OPTIMAL GROWTH AND DEVELOPMENT
GEF-25-08-26-12-000-1B
• Eastern Samar, Lawaan
Physical Status:
0.0%
Target Completion: Nov 21, 2026
Cost / Allocation
₱2.18M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
"TANIM, ANI, NUTRISYON": STRENGTHENING HOUSEHOLD NUTRITION FOR THE FIRST 1000 DAYS
GEF-25-08-26-12-000-1A
• Eastern Samar, Lawaan
Physical Status:
0.0%
Target Completion: Nov 21, 2026
Cost / Allocation
₱600,400.00
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
ELECTRIFICATION OF BRGY. PINGAN
SBDP-26-08-26-07-000-5
• Eastern Samar, General MacArthur
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF ONE-STOREY SCHOOL BUILDING
SBDP-26-08-26-07-000-4
• Eastern Samar, General MacArthur
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
OPENING WITH CONCRETING OF FARM-TO-MARKET ROAD
SBDP-26-08-26-07-000-3
• Eastern Samar, General MacArthur
Physical Status:
0.0%
Cost / Allocation
₱10.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
REHABILITATION/IMPROVEMENT OF HEALTH STATION
SBDP-26-08-26-07-000-2
• Eastern Samar, General MacArthur
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
OPENING WITH CONCRETING OF FARM-TO-MARKET ROAD
SBDP-26-08-26-07-000-1
• Eastern Samar, General MacArthur
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
Concreting of Farm to Market Road
SBDP-2026--4
• Leyte, Tabango
Physical Status:
0.0%
Cost / Allocation
₱8.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF LEVEL III WATER SYSTEM
GEF-2026--2
• Leyte, Santa Fe
Physical Status:
0.0%
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONCRETING OF FARM-TO-MARKET ROAD
SBDP-2026--3
• Leyte, Kananga
Physical Status:
0.0%
Cost / Allocation
₱10.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
ASSISTANCE TO INDIGENT INDIVIDUALS OR FAMILIES - FOOD ASSISTANCE/RICE DISTRIBUTION PROJECT
FALGU-26-08-26-04-000-1
• Eastern Samar, Borongan
Physical Status:
0.0%
Cost / Allocation
₱22.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
PROVISION OF RICE FOR EMERGENCY IN-KIND ASSISTANCE FOR EMERGENCY AND DISASTER: RICE FOR EVERY HOME: AN EMERGENCY FOOD ASSISTANCE PROGRAM FOR FAMILIES IMPACTED BY THE FUEL CRISIS BY LOCAL GOVERNMENT UNIT OF BALANGKAYAN, EASTERN SAMAR
GEF-26-08-26-03-000-3B
• Eastern Samar, Balangkayan
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
SAN JULIAN E. SAMAR RICE ASSISTANCE / "BAWAT BAYAN MAKIKINABANG" (BBM) RICE PROGRAM
GEF-26-08-26-20-000-1A
• Eastern Samar, San Julian
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
IMPROVING NUTRITIONAL STATUS THROUGH DIETARY AND MICRONUTRIENT SUPPLEMENTATION TO MALNOURISHED CHILDREN 6-59 MONTHS OLD
GEF-25-08-26-20-000-1
• Eastern Samar, San Julian
Physical Status:
0.0%
Cost / Allocation
₱2.78M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
IMPROVEMENT OF FARM-TO-MARKET ROAD IN BRGY. CAISAWAN - BRGY. BANGON ROAD, BALANGKAYAN, EASTERN SAMAR
GEF-26-08-26-03-000-3A
• Eastern Samar, Balangkayan
Physical Status:
0.0%
Target Completion: Dec 24, 2026
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
IMPROVEMENT/UPGRADING OF LOCAL ACCESS ROAD FROM BRGY. STO. TOMAS TO BRGY. STO. NIñO (SITIO HAMORAWON)
GEF-26-08-26-22-000-1B
• Eastern Samar, Sulat
Physical Status:
0.0%
Cost / Allocation
₱25.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
REHABILITATION OF LOCAL ROAD IN BARANGAY MABUHAY, ORAS
FALGU-26-08-26-00-000-10
• Eastern Samar, Oras
Physical Status:
0.0%
Cost / Allocation
₱10.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
REHABILITATION OF LOCAL ROAD IN BARANGAY MALAINTOS, DOLORES
FALGU-26-08-26-00-000-9
• Eastern Samar, Dolores
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONCRETING OF LOCAL ROAD IN BARANGAY MACA-ANGA, LLORENTE
FALGU-26-08-26-00-000-8
• Eastern Samar, Llorente
Physical Status:
0.0%
Cost / Allocation
₱15.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF FARM-TO-MARKET ROAD IN BARANGAY MABINI, SULAT
FALGU-26-08-26-00-000-7
• Eastern Samar, Sulat
Physical Status:
0.0%
Cost / Allocation
₱50.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF MULTIPURPOSE BUILDINGS IN BARANGAY MAYPANGDAN, CITY OF BORONGAN
FALGU-26-08-26-00-000-6
• Eastern Samar, Borongan
Physical Status:
0.0%
Cost / Allocation
₱40.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
EMERGENCY IN-KIND ASSISTANCE FOR EMERGENCIES AND DISASTERS: RICE FOR EVERY HOME: AN EMERGENCY FOOD ASSISTANCE PROGRAM FOR FAMILIES IMPACTED BY THE FUEL CRISIS
GEF-26-08-26-22-000-1A
• Eastern Samar, Sulat
Physical Status:
0.0%
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF FARM-TO-MARKET ROAD IN BARANGAY MALBOG, SALCEDO, EASTERN SAMAR
FALGU-26-08-26-00-000-5
• Eastern Samar, Salcedo
Physical Status:
0.0%
Cost / Allocation
₱10.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONSTRUCTION OF FARM-TO-MARKET ROAD IN BARANGAY SAN MATEO, CITY OF BORONGAN, EASTERN SAMAR
FALGU-26-08-26-00-000-4
• Eastern Samar, Borongan
Physical Status:
0.0%
Cost / Allocation
₱10.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
CONCRETING OF LOCAL ROAD IN BARANGAY SAPAO, GUIUAN, EASTERN SAMAR
FALGU-26-08-26-00-000-3
• Eastern Samar, Guiuan
Physical Status:
0.0%
Cost / Allocation
₱10.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
PURCHASE OF MEDICAL OR HOSPITAL EQUIPMENT
FALGU-26-08-26-00-000-2
• Eastern Samar, Borongan
Physical Status:
0.0%
Cost / Allocation
₱50.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
ASSISTANCE TO INDIGENT INDIVIDUALS OR FAMILIES - FOOD ASSISTANCE/RICE DISTRIBUTION PROJECT
FALGU-26-08-26-00-000-1
• Eastern Samar, Dolores
Physical Status:
0.0%
Cost / Allocation
₱61.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
PROCUREMENT OF GOODS AND COMMODITIES FOR THE NUTRITIONAL REHABILITATION PROGRAM FOR THE FIRST 1000 DAYS OF LIFE AND PRESCHOOL-AGED CHILDREN (0-5 YEARS OLD)
GEF-25-08-26-22-000-1
• Eastern Samar, Sulat
Physical Status:
0.0%
Cost / Allocation
₱2.78M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Pre-Procurement
RICE DISTRIBUTION
GEF-26-08-26-12-000-1A
• Eastern Samar, Lawaan
Physical Status:
0.0%
Target Completion: Sep 25, 2026
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 09-25) CONSTRUCTION OF DAY CARE CENTER PHASE I IN BARANGAY SALVACION, LAVEZARES, NORTHERN SAMAR
LIME-25-08-48-11-000-18
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Feb 5, 2026
Cost / Allocation
₱998,519.79
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
IMPROVEMENT OF WAREHOUSE IN BARANGAY SAN MIGUEL, LAVEZARES, NORTHERN SAMAR
LIME-25-08-48-11-000-16
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Sep 28, 2025
Cost / Allocation
₱299,802.00
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 09-25) CONCRETING OF ECCD CENTER IN LAVEZARES NORTHERN SAMAR
LIME-25-08-48-11-000-23
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Jan 28, 2026
Cost / Allocation
₱998,544.61
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 09-25) WIDENING/CONCRETING OF ROAD AT PUROK 3 ALONG LIBAS TO VILLAHERMOSA ROAD, LAVEZARES N. SAMAR
LIME-25-08-48-11-000-15
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Jan 28, 2026
Cost / Allocation
₱993,624.31
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 02-25 )INSTALLATION OF SOLAR STREET LIGHTS IN BARANGAY MARAVILLA, LAVEZARES, NORTHERN SAMAR
LIME-25-08-48-11-000-25
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Jun 18, 2025
Cost / Allocation
₱998,622.30
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 09-25) CONSTRUCTION OF DAYCARE CENTER PHASE 1 AT BRGY. BALICUATRO, LAVEZARES, NORTHERN SAMAR
LIME-25-08-48-11-000-12
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Jan 28, 2026
Cost / Allocation
₱998,544.61
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 05-25) CONSTRUCTION OF CONCRETE DRAINAGE CANAL AT BRGY. BANI LAVEZARES, NORTHERN SAMAR
LIME-25-08-48-11-000-11
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Jan 16, 2026
Cost / Allocation
₱704,976.00
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 07-25) ROAD REHABILITATION OF HINABIYA STREET, BRGY. MACARTHUR LAVEZARES, NORTHERN SAMAR
LIME-25-08-48-11-000-10
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Feb 24, 2026
Cost / Allocation
₱897,926.72
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 08-25)CONCRETING OF PAVEMENT AT SITIO BARIBADON BRGY. CARAGAS,LAVEZARES N. SAMAR
LIME-25-08-48-11-000-9
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Feb 11, 2026
Cost / Allocation
₱999,256.16
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 03-25) IMPROVEMENT OF COVERED COURT (BLEACHERS) BRGY. LIBAS, LAVEZARES, NORTHERN
LIME-25-08-48-11-000-5
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Aug 2, 2025
Cost / Allocation
₱240.22M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 06-25) EXPANSION/CONCRETING OF UPPER BUNGA AUDITORIUM, BARANGAY SABANG-TABOK, LAVEZARES, NORTHERN SAMAR
LIME-25-08-48-11-000-24
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Jan 7, 2026
Cost / Allocation
₱985,779.49
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 06-25) IMPROVEMENT OF SABANG TABOK BARANGAY HALL AT BRGY. SABANG TABOK,LAVEZARES N. SAMAR
LIME-25-08-48-11-000-20
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Feb 24, 2026
Cost / Allocation
₱151.21M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CLUSTER 03-25)CONSTRUCTION OF PASSENGER WAITING AREA, LAVEZARES, NORTHERN SAMAR
LIME-25-08-48-11-000-2
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Aug 2, 2025
Cost / Allocation
₱1.80M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 01-25) CONSTRUCTION BOARDWALK AT BARANGAY URDANETA, LAVEZARES, NORTHERN SAMAR
LIME-25-08-48-11-000-1
• Northern Samar, Lavezares
Physical Status:
100.0%
Target Completion: Jun 11, 2025
Cost / Allocation
₱2.27M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION/EXPANSION OF WATER SYSTEM AT SAWANG-LANDUSAN AT BARANGAY SAWANG, CAPUL
LIME-25-08-48-04-000-8
• Northern Samar, Capul
Physical Status:
100.0%
Target Completion: Feb 10, 2026
Cost / Allocation
₱998,558.07
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF PERIMETER FENCE OF MULTI-PURPOSE BUILDING AT SITIO CANTIL, BARANGAY SAN LUIS, CAPUL
LIME-25-08-48-04-000-7
• Northern Samar, Capul
Physical Status:
100.0%
Target Completion: Nov 29, 2025
Cost / Allocation
₱1.70M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF BOX CULVERT & REINFORCED CONCRETE COVER DRAINAGE CANAL AT SO. BAGACAY, BRGY.5 POB. CAPUL
LIME-25-08-48-04-000-6
• Northern Samar, Capul
Physical Status:
100.0%
Target Completion: Nov 16, 2025
Cost / Allocation
₱3.48M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF ROADS & IMPROVEMENT OF STRUCTURAL CONCRETE/BOX CULVERT AT BRGY. 1 POB. CAPUL
LIME-25-08-48-04-000-5
• Northern Samar, Capul
Physical Status:
100.0%
Target Completion: Feb 16, 2026
Cost / Allocation
₱3.69M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF PERIMETER FENCE AT BARANGAY SAN LUIS, CAPUL
LIME-25-08-48-04-000-4
• Northern Samar, Capul
Physical Status:
100.0%
Target Completion: Nov 28, 2025
Cost / Allocation
₱1.21M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF MULTI-PURPOSE BUILDING (DOG POUND) AT SITIO CANTIL, BARANGAY SAN LUIS, CAPUL SITIO CANTIL
LIME-25-08-48-04-000-3
• Northern Samar, Capul
Physical Status:
100.0%
Target Completion: Nov 9, 2025
Cost / Allocation
₱621,939.68
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SAN LUIS, CAPUL
LIME-25-08-48-04-000-2
• Northern Samar, Capul
Physical Status:
100.0%
Target Completion: Dec 9, 2025
Cost / Allocation
₱149.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF MULTI PURPOSE CONCRETE PAVEMENT AT SITIO BALUD, BRGY. MAGSAYSAY, BOBON, NORTHERN SAMAR
LIME-25-08-48-03-000-8
• Northern Samar, Bobon
Physical Status:
100.0%
Target Completion: Jan 11, 2026
Cost / Allocation
₱1.22M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF MUNICIPAL GARAGE, BOBON, NORTHERN SAMAR
LIME-25-08-48-03-000-7
• Northern Samar, Bobon
Physical Status:
100.0%
Target Completion: Sep 23, 2025
Cost / Allocation
₱129.70M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
EMBANKMENT OF CONSTRUCTION OF BOBON BAGONG PILIPINAS HEALTH CENTER AT BRGY. SALVACION, BOBON, NORTHERN SAMAR
LIME-25-08-48-03-000-4
• Northern Samar, Bobon
Physical Status:
100.0%
Target Completion: Oct 23, 2025
Cost / Allocation
₱1.20M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONCRETING OF ACCESS ROAD FROM NATIONAL ROAD TO THE PROPOSED SITE OF BAGONG PILIPINAS HEALTH CENTER AT BRGY. SALVACION, BOBON, NORTHERN SAMAR
LIME-25-08-48-03-000-5
• Northern Samar, Bobon
Physical Status:
100.0%
Target Completion: Oct 23, 2025
Cost / Allocation
₱2.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF STANDARD CHILD DEVELOPMENT CENTER AT PUROK ZENIA, BRGY. DANCALAN, BOBON, NORTHERN SAMAR
LIME-25-08-48-03-000-3
• Northern Samar, Bobon
Physical Status:
100.0%
Target Completion: Dec 12, 2025
Cost / Allocation
₱1.69M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CHILD DEVELOPMENT CENTER AT SITIO BALUD, BRGY. MAGSAYSAY, BOBON, N. SAMAR
LIME-25-08-48-03-000-10
• Northern Samar, Bobon
Physical Status:
100.0%
Target Completion: May 24, 2025
Cost / Allocation
₱1.30M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) PHASE II AT BARANGAY JOSE ABAD SANTOS, BOBON, NORTHERN SAMAR
LIME-25-08-48-03-000-9
• Northern Samar, Bobon
Physical Status:
100.0%
Target Completion: Jun 5, 2026
Cost / Allocation
₱2.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
IMPROVEMENT OF ROADS AT BARANGAY SALVACION (BALUCAWE) TO BRGY. BALAT-BALUD, BOBON, NORTHERN SAMAR
LIME-25-08-48-03-000-1-1
• Northern Samar, Bobon
Physical Status:
100.0%
Target Completion: May 14, 2025
Cost / Allocation
₱2.99M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
COMPLETION OF CAUSEWAY AT PUNTA DE JESUS, BARANGAY KAUSWAGAN, BIRI, NORTHERN SAMAR
LIME-25-08-48-02-000-8
• Northern Samar, Biri
Physical Status:
100.0%
Target Completion: Mar 20, 2025
Cost / Allocation
₱297,483.45
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
EXPANSION OF RHU BUILDING MUNICIPAL COMPOUND, BARANGAY POBLACION, BIRI, NORTHERN SAMAR
LIME-25-08-48-02-000-6
• Northern Samar, Biri
Physical Status:
100.0%
Target Completion: May 27, 2025
Cost / Allocation
₱199.64M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
REPAIR OF PORTION OF LUNA AND TUBELLEZA STREETS (POBLACION) AT BARANGAY POBLACION, BIRI, NORTHERN SAMAR
LIME-25-08-48-02-000-7
• Northern Samar, Biri
Physical Status:
100.0%
Target Completion: Apr 4, 2025
Cost / Allocation
₱498,590.00
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF DRAINAGE CANAL AT PUROK 1, BARANGAY STO. NIñO, BIRI, NORTHERN SAMAR
LIME-25-08-48-02-000-5
• Northern Samar, Biri
Physical Status:
100.0%
Target Completion: May 20, 2025
Cost / Allocation
₱695,526.62
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF DRAINAGE CANAL AT BARANGAY SAN PEDRO, BIRI, NORTHERN SAMAR
LIME-25-08-48-02-000-9
• Northern Samar, Biri
Physical Status:
100.0%
Target Completion: Apr 17, 2025
Cost / Allocation
₱197,067.80
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
IMPROVEMENT OF SITIO CAWAYAN FOOTBRIDGE AT BARANGAY KAUSWAGAN, BIRI, NORTHERN SAMAR
LIME-25-08-48-02-000-2
• Northern Samar, Biri
Physical Status:
100.0%
Target Completion: May 6, 2025
Cost / Allocation
₱1.39M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF COMMUNITY LEARNING CENTER AT BCES COMPOUND, BARANGAY POBLACION, BIRI, NORTHERN SAMAR
LIME-25-08-48-02-000-1
• Northern Samar, Biri
Physical Status:
100.0%
Target Completion: Apr 28, 2025
Cost / Allocation
₱1.49M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSRUCTION OF FLOOD CONTROL STRUCTURE (PHASE II) AT BRGY. SAN ROQUE
LIME-25-08-48-18-000-2
• Northern Samar, San Isidro
Physical Status:
100.0%
Target Completion: Jul 17, 2025
Cost / Allocation
₱2.49M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
COMPLETION OF BRGY. HEALTH STATION AT BRGY. SAN JOSE
-LIME-26-08-48-13-000-2
• Northern Samar, Mondragon
Physical Status:
100.0%
Target Completion: Mar 23, 2026
Cost / Allocation
₱1.49M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF SOLAR STREET LIGHTS ALONG NATIONAL HIGHWAY, SAN JOSE, NORTHERN SAMAR
LIME-25-08-48-00-000-1
• Northern Samar, San Jose
Physical Status:
100.0%
Target Completion: Jan 26, 2026
Cost / Allocation
₱23.02M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
(CLUSTER 04-25) . INSTALLATION OF SOLAR LIGHTS AT BRGY. SAN JOSE
LIME-25-08-48-11-000-22
• Northern Samar, San Jose
Physical Status:
100.0%
Target Completion: Oct 12, 2025
Cost / Allocation
₱499,406.10
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF RIVER FLOOD CONTROL AT TRANSPORT TERMINAL AT BRGY. SAN JUAN, SAN ISIDRO, NORTHERN SAMAR
LIME-25-08-48-18-000-7
• Northern Samar, San Isidro
Physical Status:
100.0%
Target Completion: Jul 1, 2025
Cost / Allocation
₱2.30M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF EVACUATION CENTER AT BRGY. SAN ROQUE, SAN ISIDRO N. SAMAR
LIME-25-08-48-18-000-6
• Northern Samar, San Isidro
Physical Status:
100.0%
Target Completion: Nov 14, 2025
Cost / Allocation
₱7.97M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
REPAIR/ IMPROVEMENT OF SAN ANTONIO DISTRICT HOSPITAL, SAN ANTONIO, NORTHERN SAMAR
LIME-25-08-48-00-000-8
• Northern Samar, San Antonio
Physical Status:
100.0%
Target Completion: Sep 17, 2025
Cost / Allocation
₱5.01M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION/INSTALLATION OF SOLAR STREET LIGHTS ALONG NATIONAL HIGHWAY, PAMBUJAN, NORTHERN SAMAR.
LIME-25-08-48-00-000-26
• Northern Samar, Pambujan
Physical Status:
100.0%
Target Completion: Dec 14, 2025
Cost / Allocation
₱22.56M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF FARM TO MARKET ROAD (FMR) FROM NATIONAL ROAD (SIMORA-PALAPAG ROAD) TO BARANGAY CAGDARAO PHASE II, LAOANG, NORTHERN SAMARBARANGAYS
LIME-25-08-48-00-000-14
• Northern Samar, Palapag
Physical Status:
100.0%
Target Completion: Dec 24, 2026
Cost / Allocation
₱33.48M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF FARM TO MARKET ROAD FROM NATIONAL ROAD (SIMORA - PALAPAG ROAD) TO BRGY. CAGDARAO, LAOANG, NORTHERN SAMAR
LIME-25-08-48-00-000-2-1
• Northern Samar, Palapag
Physical Status:
100.0%
Target Completion: Mar 12, 2026
Cost / Allocation
₱42.67M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
OPENING & CONCRETING OF FARM TO MARKET ROAD FROM CAG-AMESARAG, LOPE DE VEGA, N. SAMAR
LIME-25-08-48-24-000-4
• Northern Samar, Lope de Vega
Physical Status:
100.0%
Target Completion: Feb 22, 2026
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
EXTENSION OF CONCRETE PATHWALK FROM BRGY. HENARONAGAN TO PUROK 9 POBLACION, LOPE DE VEGA, N. SAMAR
LIME-25-08-48-24-000-3
• Northern Samar, Lope de Vega
Physical Status:
100.0%
Target Completion: Feb 22, 2026
Cost / Allocation
₱3.49M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF RESIDUAL CONTAINMENT AREA AT BRGY. BAGASBAS, MONDRAGON, NORTHERN SAMAR
LIME-25-08-48-13-000-6
• Northern Samar, Mondragon
Physical Status:
100.0%
Target Completion: Nov 28, 2025
Cost / Allocation
₱7.99M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF MDRRM OPERATION CENTER - PHASE 1 AT BRGY. CHITONGCO, MONDRAGON, NORTHERN SAMAR
LIME-25-08-48-13-000-7
• Northern Samar, Mondragon
Physical Status:
100.0%
Target Completion: Dec 7, 2025
Cost / Allocation
₱5.99M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF ACCESSIBLE STAIRS TO MUNICIPAL EVACUATION CENTER PHASE 1 AT BRGY. STA. POTENCIANA, MAPANAS, NORTHERN SAMAR
LIME-25-08-48-12-000-10
• Northern Samar, Mapanas
Physical Status:
100.0%
Target Completion: Sep 3, 2025
Cost / Allocation
₱2.98M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
IMPROVEMENT OF MUNICIPAL GYMNASIUM AT BRGY. DEL NORTE, MAPANAS, NORTHERN SAMAR
LIME-25-08-48-12-000-9
• Northern Samar, Mapanas
Physical Status:
100.0%
Target Completion: May 25, 2025
Cost / Allocation
₱992,408.02
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF DEL NORTE MULTI-PURPOSE GYM PHASE 1, BARANGAY DEL NORTE, MAPANAS, N. SAMAR
LIME-25-08-48-12-000-8
• Northern Samar, Mapanas
Physical Status:
100.0%
Target Completion: May 8, 2025
Cost / Allocation
₱2.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF MULTI-PURPOSE GYM PHASE 1, BARANGAY NAPARASAN, MAPANAS, NORTHERN SAMAR
LIME-25-08-48-12-000-7
• Northern Samar, Mapanas
Physical Status:
100.0%
Target Completion: Oct 10, 2025
Cost / Allocation
₱2.97M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF SILJAGON MULTI-PURPOSE GYM PHASE 2 OF BRGY. SILJAGON, MAPANAS, NORTHERN SAMAR
LIME-25-08-48-12-000-6
• Northern Samar, Mapanas
Physical Status:
100.0%
Target Completion: May 14, 2025
Cost / Allocation
₱2.98M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF MAIHS MULTI-PURPOSE GYM PHASE 2, BARANGAY MANAYBANAY, MAPANAS, NORTHERN SAMAR
LIME-25-08-48-12-000-5
• Northern Samar, Mapanas
Physical Status:
100.0%
Target Completion: Dec 19, 2025
Cost / Allocation
₱2.97M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
IMPROVEMENT OF JUBASAN BARANGAY ROAD, BARANGAY JUBASAN, MAPANAS, NORTHERN SAMA
LIME-25-08-48-12-000-4
• Northern Samar, Mapanas
Physical Status:
100.0%
Target Completion: Apr 6, 2025
Cost / Allocation
₱1.98M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
COMPLETION OF NAPARASAN-QUEZON FMR OF BARANGAY QUEZON, MAPANAS, NORTHERN SAMAR
LIME-25-08-48-12-000-2
• Northern Samar, Mapanas
Physical Status:
100.0%
Target Completion: Feb 20, 2025
Cost / Allocation
₱982,723.99
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
REHABILITATION/IMPROVEMENT OF SAN ROQUE STREET OF BARANGAY ST. POTENCIANA, MAPANAS, NORTHERN SAMAR
LIME-25-08-48-12-000-1
• Northern Samar, Mapanas
Physical Status:
100.0%
Target Completion: Mar 29, 2025
Cost / Allocation
₱1.98M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
FARM TO MARKET ROAD IN BRGY. MAGHIPID, LOPE DE VEGA, N. SAMAR
LIME-25-08-48-24-000-2
• Northern Samar, Lope de Vega
Physical Status:
100.0%
Target Completion: Feb 27, 2026
Cost / Allocation
₱3.99M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
EXTENSION OF FARM TO MARKET ROAD IN BRGY. CAG-AGUINGAY, LOPE DE VEGA, N. SAMAR
LIME-25-08-48-24-000-1
• Northern Samar, Lope de Vega
Physical Status:
100.0%
Target Completion: Feb 2, 2026
Cost / Allocation
₱2.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
IMPROVEMENT OF BARANGAY AUDITORIUM (CONCRETE PAVEMENT) AT BRGY. SAN ISIDRO, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-12
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Apr 6, 2026
Cost / Allocation
₱497,969.06
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. AGUINALDO, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-11
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: May 4, 2026
Cost / Allocation
₱499,734.58
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. MAC ARTHUR, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-10
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Jun 12, 2026
Cost / Allocation
₱1.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. POPONTON, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-9
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: May 15, 2026
Cost / Allocation
₱499,340.63
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. DAPDAP, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-8
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: May 3, 2026
Cost / Allocation
₱499,717.00
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. ROXAS, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-7
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: May 24, 2026
Cost / Allocation
₱1.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. EPAW, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-6
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Jun 4, 2026
Cost / Allocation
₱1.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. SAN ANTONIO, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-5
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Jun 6, 2026
Cost / Allocation
₱1.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. IMELDA, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-4
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Jul 4, 2026
Cost / Allocation
₱1.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. SAN JOSE, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-3
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Jun 4, 2026
Cost / Allocation
₱1.50M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. MATELARAG, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-2
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: May 29, 2026
Cost / Allocation
₱499,186.80
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PATHWAY AT BRGY. CATOTO-OGAN, LAS NAVAS, NORTHERN SAMAR
LIME-26-08-48-10-000-1
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: May 19, 2026
Cost / Allocation
₱499,587.38
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF HANGING BRIDGE PHASE II AT BARANGAY TAGAB.IRAN, LAS NAVAS NORTHERN SAMAR
LIME-25-08-48-10-000-5
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Jun 25, 2025
Cost / Allocation
₱2.46M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF HANGING BRIDGE PHASE-II AT BARANGAY RIZAL, LAS NAVAS N. SAMAR
LIME-25-08-48-10-000-4
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Jun 15, 2025
Cost / Allocation
₱2.46M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF HANGING BRIDGE PHASE-II AT BARANGAY DEL PILAR, LAS NAVAS N. SAMAR
LIME-25-08-48-10-000-3
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Jul 3, 2025
Cost / Allocation
₱2.67M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF HANGING BRIDGE PHASE - II AT BARANGAY HANGI, LAS NAVAS N. SAMAR
LIME-25-08-48-10-000-2
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: Jul 9, 2025
Cost / Allocation
₱2.67M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
REBLOCKING AND UPGRADING OF EXISTING MUNICIPAL ROAD TO CLIMATE RESILIENT DESIGN STANDARDS AT H. JOLEJOLE DISTRICT AND QUIRINO DISTRICT POBLACION, LAS NAVAS NORTHERN SAMAR
LIME-25-08-48-10-000-1
• Northern Samar, Las Navas
Physical Status:
100.0%
Target Completion: May 28, 2025
Cost / Allocation
₱5.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Construction of Farm to Market Road from National Road (Simora - Palapag Road) to Brgy. Cagdarao, Laoang, Northern Samar
LIME-25-08-48-00-000-2
• Northern Samar, Laoang
Physical Status:
0.0%
Target Completion: Mar 12, 2026
Cost / Allocation
₱42.67M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONCRETING OF SECONDARY ROAD OF LAOANG HOUSING PROJECT
LIME-25-08-48-08-000-2
• Northern Samar, Laoang
Physical Status:
100.0%
Target Completion: Oct 1, 2025
Cost / Allocation
₱14.94M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
PROPOSED CONSTRUCTION OF LAOANG PUBLIC CEMENTERY PHASE VI AT BRGY. GUILAOANGI, LAOANG, NORTHERN SAMAR
LIME-25-08-48-08-000-5-1
• Northern Samar, Laoang
Physical Status:
100.0%
Target Completion: Oct 11, 2025
Cost / Allocation
₱8.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
Proposed construction of Laoang Public Cementery Phase VI at Brgy. Guilaoangi, Laoang, Northern Samar
LIME-25-08-48-08-000-5
• Northern Samar, Laoang
Physical Status:
0.0%
Target Completion: Oct 11, 2025
Cost / Allocation
₱8.00M
Disbursed
₱0.00
Infrastructure (ProjectWatch)
Completed
CONSTRUCTION OF CONCRETE PAVEMENT OF GAMAY BOULEVARD AT BRGY. BURABOD, GAMAY, NORTHERN SAMAR
LIME-26-08-48-07-000-1
• Northern Samar, Gamay
Physical Status:
100.0%
Target Completion: Jun 1, 2026
Cost / Allocation
₱200.00
Disbursed
₱0.00